What You’re Allowed to Build in

County of Davis ADU Local Zoning Laws

KEY RULES AT A GLIMPSE

Size and Separation

Maximum size: 1200 sqft
Side/rear setbacks: 4 feet
Two story: Yes
Building separation: 6 feet

Additional Requirements

Soils Report: No
Building Verification Survey: No
Coastal permit (in some areas): No
Stormwater Mitigation: No

Regulations for Accessory Buildings

Permission for Accessory Dwelling Unit

Permission for an Accessory Dwelling Unit is not specified in the city code.

Yes

AEAgriculture Estate/Limited Agriculture
A-1Limited Agriculture
A-5Agriculture And Farm Industry
A-10Agriculture And Farm Production
R-1Residential Single-Family
R-2Residential Two-Family
R-3Residential Multifamily

No detached dwelling in the County shall be less than 600 square feet.

No accessory buildings, structures, or parking spaces, except swimming pools, can cover more than 25% of the required minimum rear yard, and no accessory building(s) can exceed 1,000 square feet.

Height limits do not restrict the construction of necessary roof structures or equipment, as long as no additional floor space is created above the limit.

Accessory buildings can only be built on a lot after the principal building is erected, unless both are constructed at the same time.

Only one dwelling structure is allowed per building lot.

Municipal Department Contact Details

DepartmentContact Details
Building Inspection
Contact Number(801) 451-3279
Address61 South Main Street Farmington, UT – 84025
Planning & Zoning
Contact Number(801) 451-3279
Address61 South Main Street Farmington, UT – 84025

Zoning Regulations

Height and Area Regulations of Zoning Districts
Development StandardsAEA-1A-5A-10R-1R-2R-3
Minimum Lot Area (sq. ft.)1/2 acre1 acre5 acre10 acre900090009000 (plus 2000 for each additional unit over two in each building)
Maximum Height (ft)35353535303035
Front Setback (ft)25252525252525
Side Setbacks (ft)10101010888
Rear Side Yard (ft)25252525252525
Referencehttps://daviscounty.municipalcodeonline.com/book?type=ordinances#name=Section_15.20.1509A_Part_I_R-1_Residential_Single-Family
Application Process for Building Permit
ProcessRequirementDetails
Application Submission
Digital set of plans/blueprintsInclude a site-plan with setbacks noted on all four sides
Site plan detailsShow property address, actual lot dimensions, size and location of all structures, driveways, parking facilities, side yards, front and rear setbacks, abutting streets, north arrow, scale, and assessor’s parcel number.
Contractor informationProvide name, business address, and Utah State license number for General Contractor, Electrical Contractor, Plumbing Contractor, and Mechanical Contractor.
Sewer connection verification (if applicable)Written verification from the respective sewer district or approval from Davis County Health Department for a septic tank.
Additional documents (if applicable)Improvement Agreement, Release Waiver and Assumption of Risk, Permanent Power Agreement (for new construction), Owner/Builder Certification Form (if no contractors are used).
Permit for work in County right-of-wayRequired from the Public Works Department, 650 North 1500 East, Fruit Heights
Plan ReviewDetailed project plansInclude site plan, floor plans, elevation drawings, structural details, electrical, plumbing, and mechanical plans.
Revisions (if necessary)Address review commentsMake necessary revisions to the plans and resubmit if there are issues identified during the review process.
Permit IssuanceApproved applicationOnce all plans are approved, the building permit is issued and must be displayed at the construction site.
InspectionsScheduled inspectionsInspections required at various stages (foundation, framing, electrical, plumbing) during construction.
Final inspections and certificate occupancyCompletion of constructionA final inspection is conducted. If passed, a Certificate of Occupancy (CO) is issued, allowing legal occupancy of the building.
Referencehttps://www.daviscountyutah.gov/docs/librariesprovider29/building-permits/building_permit_requirements_-_home.pdf?sfvrsn=2
Fees for Building Permit and Application Process
ProcessPermitFee
Building Plan ReviewPreliminary building permit review60% of the building permit fee
Site PlanPlanning Commission$200.00
Accessory UnitsPermit fee$200.00
New ConstructionMinimum permit fee$1,000.00
Remodel or Addition to Existing ConstructionMinimum permit fee$500.00
Zoning and Land Use Fees
Conditional Use Permit$500.00
Rezoning$250.00
Excavation Permit for native material removal$250.00
Zoning Ordinance Amendment$250.00
Appeals Fee$200.00
Referencehttps://daviscounty.municipalcodeonline.com/book
Davis County Building Permit Fee Schedule
Valuation RangeFee or Fee Plus MultiplierMaximum Fee Amount Per Range
$0.00—$7,500.00$200.00$200.00
$7,501.00—$15,000.00$200.00 + 0.025 per dollar over $7,500.00 in valuation$387.50
$15,001.00—$25,000.00$387.50 + 0.0188 per dollar over $15,000.00 in valuation$575.50
$25,001.00—$50,000.00$575.50 + 0.0141 per dollar over $25,000.00 in valuation$928.00
$50,0001.00—$100,000.00$928.00 + 0.0106 per dollar over $50,000.00 in valuation$1,458.00
$100,001.00—$250,000.00$1,458.00 + 0.0080 per dollar over $100,000.00 in valuation$2,658.00
$250,001.00—$500,000.00$2,658.00 + 0.006 per dollar over $250,000.00 in valuation$4,158.00
$500,001.00—$1,000,000.00$4,158.00 + 0.0045 per dollar over $500,000.00 in valuation$6,408.00
$1,000,001.00—$2,000,000.00$6,408.00 + 0.0034 per dollar over $1,000,000.00 in valuation$9,808.00
$2,000,001.00—$5,000,000.00$9,808.00 + 0.0026 per dollar over $2,000,000.00 in valuation$17,608.00
$5,000,001.00 and above$17,608.00 minimum + $96.00 per hour for each hour of service exceeding 183 hours**
*For projects over $5 million requiring more than 183 service hours, the Permittee must pay Davis County within 30 days of receiving an invoice. Davis County may issue multiple invoices based on project scope. Davis County may issue multiple invoices based on project scope.