What You’re Allowed to Build in

County of UTAH ADU Local Zoning Laws

KEY RULES AT A GLIMPSE

Size and Separation

Maximum size: 1200 sqft
Side/rear setbacks: 4 feet
Two story: Yes
Building separation: 6 feet

Additional Requirements

Soils Report: No
Building Verification Survey: No
Coastal permit (in some areas): No
Stormwater Mitigation: No

Regulations for Accessory Buildings

Yes

RA-5Residential Agricultural Zones
RRRural Residential Zones
TR-5Transitional Residential Zone
CE-1Critical Environmental Zone
CE-2Critical Environmental Zone
M & G-1Mining & Grazing Zone
A-40Agricultural Zone 1
G-1Grazing Zone
AEAgriculture Estate/Limited Agriculture
A-1Limited Agriculture
A-5Agriculture And Farm Industry
A-10Agriculture And Farm Production
R-1Residential Single-Family
R-2Residential Two-Family
R-3Residential Multifamily

Municipal Department Contact Details

Contact Details
Phone801-851-8343
Address51 South University Avenue
Suite 117 Provo, Utah 84601
DivisionPlanning / Zoning
Emailmariep@utahcounty.gov
Phone801-851-8343
DivisionBuilding permits, Inspections
Emailshaunal@utahcounty.gov
Phone801-851-8342

Standard for ADUs

StandardInternal Accessory Dwelling UnitAttached Accessory Dwelling UnitDetached Accessory Dwelling Unit
Maximum Floor AreaNo maximum floor area– 1,000 sq ft for all habitable stories– 1,000 sq ft for all habitable stories
  – 1,001 to 1,500 sq ft with restrictive covenant for moderate income housing– 1,001 to 1,500 sq ft with restrictive covenant for moderate income housing
ParkingMinimum of 1 additional off-street parking spaceMinimum of 2 additional off-street parking spacesMinimum of 2 additional off-street parking spaces
Lot or Parcel AreaN/AMinimum of 1 acreMinimum of 1 acre
Conversion RestrictionAdditions to the primary dwelling cannot be converted to an internal accessory dwelling for 1 year from the issuance of the certificate of occupancyN/AN/A
PlacementN/AN/ACan be placed within a larger accessory structure (e.g., barn, garage), but the floor area of the dwelling unit is limited
Floor Area Calculation
N/A
N/A
– Garages, covered or enclosed porches or decks not included in the total floor area
– Areas used as part of the accessory structure use not included in the total floor area
Separate EntrancesN/AN/ASeparate outside entrances required for both the dwelling unit and the accessory structure; no interior connection allowed
Referencehttps://utahcounty.municipalcodeonline.com/book?type=landordinances#name=8.116_Accessory_Dwelling_Units

 

StandardsRA-5RRTR-5CE-1CE-2M & G-1A-40G-1
Minimum Lot Area (acres)5555020504050
Front Yard (ft)3030303030303030
Side Yard (ft)1515151515151515
Rear Yard (ft)1515151515151515
Building Height (ft)4040404040404040
Referencehttps://utahcounty.municipalcodeonline.com/book?type=landordinances#name=12_REGULATIONS_WITHIN_ZONES

 

ProcessRequirementDetails
Application Submission
Completed Building Permit Application and associated Health Department Form
Submit to: 51 S University Ave, Suite 117, Provo UT 84601
Office Hours: Monday-Friday 8:00 AM – 4:30 PM
Owner InformationOwner’s Name, Application DateProvide owner’s name and the date of application.
Owner’s Mailing AddressMailing Address, City, State, ZipProvide complete mailing address, including city, state, and zip code.
Contact InformationName, Phone Number, EmailProvide contact name, phone number, and email for correspondence.
Contractor InformationBusiness Name, License NumberProvide contractor’s business name and state license number.
Contractor’s Mailing AddressMailing Address, Phone NumberProvide complete mailing address and phone number for the contractor.
Job Site InformationApproximate Job Site Address/LocationProvide the job site address or location where the work will be performed.
Existing StructuresList Any Existing Structures on PropertyList any structures already present on the property.
Property DetailsProperty Parcel Number, Lot Size (acres)Provide the parcel number and lot size in acres.
Utility InformationPower Utility Provider Name, Fuel Type (Natural Gas or LPG)Specify the power utility provider and the type of fuel used (e.g., Natural Gas, LPG).
Fire Safety InformationExisting Fire Sprinkler System, Distance to Nearest Fire HydrantIndicate whether there is an existing fire sprinkler system and provide the distance to the nearest fire hydrant.
Work DescriptionDescription of Work, Value of WorkProvide a brief description of the work and estimate the value of the work in USD.
Health Department ApprovalHealth Department Review for Sewer, Water, and WastewaterObtain necessary approvals from the Health Department for connections to sewer, potable water, and wastewater systems.
Plot Plan SubmissionThree paper copies and one electronic copy in PDF format on CD or via emailSubmit three paper copies and one electronic copy of the plot plan in PDF format.
Construction PlansTwo paper sets at ¼” scale, and one electronic copy in PDF format on CD or via emailSubmit two paper sets of construction plans at a ¼” scale, along with one electronic copy in PDF format.
Engineered Plans & CalculationsTwo paper sets stamped and signed, plus one electronic copy in PDF format on CD or via emailSubmit two stamped and signed paper sets of engineered plans and calculations, along with one electronic copy in PDF format.
Approval SignaturesApproval by Utah County Health Department, Applicant’s SignatureObtain approval signatures and ensure the applicant signs the permit application.
Fee SubmissionBuilding Submittal Fee, Invoice NumberPay the required building submittal fee and provide the invoice number.
Applicant AgreementCompliance with County and State Building Laws and OrdinancesThe applicant must agree to comply with all relevant laws and ordinances.
Permit ValidityValidity ConditionsPermit becomes null and void if construction is not commenced within 180 days or if inspections are not performed within 180 days.
ReferenceUtah County Building Permit Application
Fee TypeDescriptionRate
Construction Fees by Occupancy Type                           Per Square Foot Multiplier
A-1 Through A-5Assembly$1.50
BBusiness$1.50
EEducational$1.50
F-1 and F-2Factory$0.50
H-1 Through H-5Hazardous$1.50
I-1 Through I-4Institutional$1.50
MMercantile$1.00
R-1 Through R-2Hotels & Multi-Family$1.50
R-3 Through R-4Residential$1.00
S-1 and S-2Storage$0.50
UUtility/Miscellaneous$0.50
Additional Construction Fees                                For Specific Scenarios
Manufactured Home (No Bsmnt or Garage)Factory Built Portion Only$0.30
All OccupanciesShell Only Buildings (prior to tenant build-out)$0.30
All OccupanciesUnfinished Basements$0.30
All OccupanciesRemodeling$0.30
All OccupanciesSwimming Pools and Water Tanks$0.30
All OccupanciesChange in Use or Occupancy$0.30
All OccupanciesFinishing of Unfinished BasementDifference Between Multipliers
All OccupanciesPorches, Decks, & Other Unwalled Structures$0.30
Permit FeesFlat Rate Fees
New BuildingsBuilding Permit Submittal Fee$300.00
Minimum Permit FeeMinimum fee for any permit$101.00
ReferenceUTAH COUNTY GOVERNMENT CURRENT FEE SCHEDULE AND ORDINANCE